欧美 日韩 国产在线_国产精品毛片一区内射_18禁在线看 欧美_japanese在线播放国产_日韩一区二区无码高清_亚洲人成人综合无码_久久亚洲日韩欧美综合_国产亚洲日朝欧美…_再用点力今晚随你弄_成人夜视频在线观看免费

 

SHANXI XINGDATONG

INDUSTRIES CO.,LTD.

山西興達通?機電設(shè)備有限公司

ABOUT US
關(guān)于我們

公司簡介

Back-swing Continuous Spiral Welded Pipe Line
來源: | 作者:xindatong | 發(fā)布時間: 3068天前 | 811 次瀏覽 | 分享到:
Back-swing continuous SSAW Pipe Mill
Uncoiler bending strip tail at the end of coil, shearing&butt-welding unit using fission structure in butt-welding part in order to bevel the joint plate, quick edge milling machine


This pipe mill is a back-swing continuous SSAW Pipe Mill which has flying welding car and reliable progressive technology. The mill uses the leading-edge techniques of our company owns that including: Uncoiler bending strip tail at the end of coil, shearing&butt-welding unit using fission structure in butt-welding part in order to bevel the joint plate, quick edge milling machine and so on. These new techniques ensure the process and technology of mill, the quality and cost of production have reached the domestic and international advanced level.

This pipe mill is a whole set of mill which integrated machinery, electrical and hydraulic control system.

During the designing and manufacturing progress, the safeguard measure for equipments and operators were set for safety. For example: There are four sets of pressure sensor in the screw-down device which belongs to levelling machine; According to the sudden change of thickness, the self-protection unit is used in the depress device of pinching machine and main driver. Due to using the field-bus control system, operator can set the parameter of each machine with digitization setting screen. Through each power protection device and sensing element in the hardware unit, all kinds of operation parameters will be transmitted to the control centre for analytical processing, and then adjust the running status in time, all of these parameters will display in the HMI so that the operator can adjust the running status without delay, all of above measures effectively improve the operability and safety of the whole mill.

Forming process introduction:

Load the coil with crane onto the coil-car's carrier roller at first, and move the car into the center-line of Uncoiler, move the cone-head to clamp the coil tightly, centring the center-line of coil match with Main Driver line through operating buttons, then move the Peeler close to the coil and start the coil car roller motor to rotate in order to open the head of coil with Peeler working together, after the coil head goes into the straighten rollers the first bending could be done, then the coil head keeps going forward to Pinching and Levelling machine. After the coil head goes into the pinching rollers, depress down the pinching roller and feed the steel strip forward, the steel strip will go through the seven levelling rollers and keep going, the center-line of steel strip will keep centring with mill center-line by the Side Guide roller devices. After Shearing&Butt-welding machine, the steel strip will be sheared and butt-welded, then go into the Pinching roller machine and move forward into looper. All of the above unit machines is fixed on the Flying Welding Car which keep synchronous with Main Driver and realize the continuous producing for the pipe making work. After the looper the steel strip moves forward into Main Driver, the Main Driver supplys the total power force for forming force which overcome all kinds of resistance force e.g. Edge milling and forming resistance. Edge miller is consist of Facing miller and Bevelling miller, ensure the edge of steel strip continued and smooth,  prepare for the on-line submerged arc welding and ensure the welding quality. After edge milling the steel strip will move into Prebending machine and Guide Board device which keep moving steady into the Forming machine, the forming process is finished by No.1, No.2, No.3 forming roller which bend the steel strip directly, and the sizing process is finished by No.4, No.5, No.6, No.7, No.8 forming roller. During the forming process the Lincoln welder will weld the connecting two edges inside and outside. After inside and outside welding parts the pipe will move into Pay-off table area, the pipe will be cut to length by Plasma cutter and Length Sensor device, then the pipe will be transported out of Pay-off table by Moving Car, repeat the cutting and moving off work over and over, ensure the continuous producing. 

山西省太原市萬柏林區(qū)漪汾街10號麥特摩爾大廈1004室

Email:wbl68wbl@163.com

手機:13994223533    86-0351-7995983

網(wǎng)址:?www.m.atbaidu.cn   www.sxxdtjd.com

  • 姓名
  • 聯(lián)系方式*
  • 留言意見*
提交
山西興達通機電設(shè)備有限公司秉承“和諧務(wù)實、開拓創(chuàng)新”的企業(yè)宗旨,為國內(nèi)外廣大用戶提高質(zhì)量的設(shè)備、技術(shù)和服務(wù),攜手共進,共創(chuàng)佳績!
主站蜘蛛池模板: 插成熟少妇一线天 | 日韩无码性爱视频 | 亚洲成人免费AV一区二区三区久久久 | 国产菊眼屁股99 | 精品人妻无码一区二区蜜桃99 | 116美女午夜影院116美女午夜剧场 | 成人a片无码免费在线观看 不卡一区二区国产高清视频 | 黄色污成人网站在线观看 | 3级生活片1级片黄色生活片1级片 | 男男腐肉GV无码 | 色哟哟日韩精品一区二区三区 | 欧美三级三级三级爽爽 | 亚洲av久久无码伊人 | 国产AV无码一区 | 国产一级a毛一级a看免费视频黑人 | 搡老女人老91妇女老熟女 | 国产亚洲网站一区一卡 | 亚洲熟妇高清无码久久精品 | 18禁国产精品久久久久久KTV | 黄色免费观看视频。 | 国产综合精品久久久久成人影 | 人伦XXXX另类XX| 羞羞视频网站在线观看 | 潘金莲做爰高潮A片中国老太太 | 17c波多野结衣无码蜜桃传媒 | 人人操人人干人人摸 | 一级毛片短视频AA | 精品成人18秘 亚洲AV蜜臀 | 国产亲子乱一区二区 | 一本一道加勒比无码aⅴ一区 | 精品免费一三区产品久 | 国产老女人乱婬免费 | 国产最新无码系列在线观看 | AV网页在线观看 | 亚洲AV成人一区国产精品网 | 天堂一区二区人妻影院 | 美女黄网站十八禁 | 亚洲 xxx 成人 | 亚洲影院婷婷五月天 | 国产 91丝袜在线播放动漫 | 中国一级片免费在线观看 |